{"id":11281,"date":"2022-05-26T12:01:44","date_gmt":"2022-05-26T10:01:44","guid":{"rendered":"https:\/\/www.lindustriadellecostruzioni.it\/?post_type=riviste&#038;p=11281"},"modified":"2022-05-27T11:03:03","modified_gmt":"2022-05-27T09:03:03","slug":"a-school-building-between-formal-abstraction-and-material-expression","status":"publish","type":"riviste","link":"https:\/\/www.lindustriadellecostruzioni.it\/en\/riviste\/a-school-building-between-formal-abstraction-and-material-expression\/","title":{"rendered":"A SCHOOL BUILDING BETWEEN FORMAL ABSTRACTION AND MATERIAL EXPRESSION"},"content":{"rendered":"<p>The project of the Kr\u00e4meracker primary school has a constructional concept based on the prefabrication of structural components and the employment of various finishing materials. Concrete and lime plaster components and perforated terracotta bricks are placed in a layout that resembles the structural grid, paced on the fa\u00e7ades by the reiterated windows, conceived as voids between columns and concrete slabs.The rigorous layout of the fa\u00e7ades and the material textures on the surfaces are the main characteristics of the two newly-constructed buildings and mark a strong difference from the existing buildings, used as a secondary school.The main front is characterized by bulging columns at the first two levels; at the top level they are aligned with the edge of the front, but their width is smaller.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project of the Kr\u00e4meracker primary school has a constructional concept based on the prefabrication of structural components and the employment of various finishing materials. Concrete and lime plaster components and perforated terracotta bricks are placed in a layout that resembles the structural grid, paced on the fa\u00e7ades by the reiterated windows, conceived as voids [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":11200,"template":"","meta":[],"tag_riviste":[187],"codici_registrazione":[],"_links":{"self":[{"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/riviste\/11281"}],"collection":[{"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/riviste"}],"about":[{"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/types\/riviste"}],"author":[{"embeddable":true,"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/users\/4"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/media\/11200"}],"wp:attachment":[{"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/media?parent=11281"}],"wp:term":[{"taxonomy":"tag_riviste","embeddable":true,"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/tag_riviste?post=11281"},{"taxonomy":"codici_registrazione","embeddable":true,"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/codici_registrazione?post=11281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}