{"id":11215,"date":"2022-05-24T13:10:47","date_gmt":"2022-05-24T11:10:47","guid":{"rendered":"https:\/\/www.lindustriadellecostruzioni.it\/?post_type=riviste&#038;p=11215"},"modified":"2022-06-30T16:17:46","modified_gmt":"2022-06-30T14:17:46","slug":"detail-in-reuse-necessity-or-virtue","status":"publish","type":"riviste","link":"https:\/\/www.lindustriadellecostruzioni.it\/en\/riviste\/detail-in-reuse-necessity-or-virtue\/","title":{"rendered":"DETAIL IN REUSE: NECESSITY OR VIRTUE?"},"content":{"rendered":"<p>Refurbishment projects of existing buildings raise some issues of technical and<br \/>\ntechnological retrofit, which are particularly relevant in the management of<br \/>\ndetails. In the addition of new equipment, partitions, systems, and \u2013 last but not least \u2013 in<br \/>\nthe treatment of existing surfaces, detail design often coincides with the mere<br \/>\napplication of technical and regulatory requirements. Hence, it follows a logic of<br \/>\nnecessity, often compromising the form and quality of the pre-existing space<br \/>\nconsequently. When introducing new elements, detail design is indeed a necessity,<br \/>\nbut at the same time, it can be an opportunity for virtuous operations.<br \/>\nThe management of the conflict between new realizations and the incoherence of<br \/>\nthe existing fabric \u2013 for example, when performing interventions on valuable<br \/>\nhistorical buildings \u2013 can trigger an approach to detail with a capital D.<br \/>\nAspects such as joints, rational connection between parts, and the critical and<br \/>\nmethodological separation between the new and the ancient can be guiding<br \/>\nprinciples for small-scale technical solutions and technological and material choices,<br \/>\ncomplying with the inherent requirements of interventions.<br \/>\nIf this focus is combined with the figurative and compositional design of detail<br \/>\naspects, this experimentation field can be turned into a virtue, hence quality, and a<br \/>\nverification method for the project.<\/p>\n<p><a href=\"https:\/\/www.lindustriadellecostruzioni.it\/en\/shop\/\">Read more<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Refurbishment projects of existing buildings raise some issues of technical and technological retrofit, which are particularly relevant in the management of details. In the addition of new equipment, partitions, systems, and \u2013 last but not least \u2013 in the treatment of existing surfaces, detail design often coincides with the mere application of technical and regulatory [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":11091,"template":"","meta":[],"tag_riviste":[187],"codici_registrazione":[],"_links":{"self":[{"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/riviste\/11215"}],"collection":[{"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/riviste"}],"about":[{"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/types\/riviste"}],"author":[{"embeddable":true,"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/users\/4"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/media\/11091"}],"wp:attachment":[{"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/media?parent=11215"}],"wp:term":[{"taxonomy":"tag_riviste","embeddable":true,"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/tag_riviste?post=11215"},{"taxonomy":"codici_registrazione","embeddable":true,"href":"https:\/\/www.lindustriadellecostruzioni.it\/en\/wp-json\/wp\/v2\/codici_registrazione?post=11215"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}